01 / Align · System demonstrators
A blueprint for designing and funding urban system demonstrator programmes
How can cities and funders turn climate commitments into programmes that test and change how urban systems work?
This Blueprint is for funders, national governments, city networks and programme designers. It draws on the Swedish system demonstrator programme and the Climate Smart Cities Challenge to explain how to design, fund and support a programme.
Full Blueprint · Detailed online reference
For a shorter introduction, download the programme design guide (PDF, 18 pages). Both support the same model. Return to the system demonstrators model overview.
On this page
Introduction
This blueprint is for funders, national governments, city networks, international organisations and programme designers who want to design and implement urban system demonstrators and the funding programmes to support them. It draws mainly on the experience of a Swedish system demonstrator programme, run by Vinnova, Viable Cities and the Swedish Energy Agency between 2022 and 2026, and on the Climate Smart Cities Challenge, in which UN-Habitat and Viable Cities applied the same method in Colombia, the UK, Brazil and Uganda.
Chapter 1 explains what system demonstrators are, why they were developed and the method to implement them. Chapter 2 describes three system demonstrators, in Lund, Bristol and Bogotá, showing how the method has been applied in practice and what it has achieved so far. Chapter 3 describes the Swedish system demonstrator programme and sets out a model for designing similar programmes, including design considerations. Table 3.2 summarises the model and can serve as a checklist for a concept note or programme document. Chapter 4 provides sample criteria for grant calls or other city selection routes. Chapter 5 is a readiness ladder for judging where a city starts and what support it needs next. Chapter 6 describes the support available to those adopting the blueprint.
The blueprint has been produced by Viable Cities and Dark Matter Labs, with contributions from the Cities Climate Finance Leadership Alliance, Nesta, UNEP, UN-Habitat, the World Economic Forum and the World Resources Institute.
We thank the following organisations, which took part in consultation sessions during the development of the blueprint: CapZone Investments, FAO, Formas, Green Transition Initiative, the Swedish Energy Agency and the Kerala Institute of Local Administration.
Foreword from Viable Cities
Over the past decade, research and innovation policy in Sweden and across Europe has increasingly been oriented towards societal challenges, missions and the transformation of sociotechnical systems. Cities hold a particular place in this shift. Energy, mobility, the built environment and the flows of materials and goods that sustain urban life are closely interconnected, and the infrastructure, institutions, everyday practices and cultural meanings that hold them together tend to reinforce one another. Reaching climate neutrality therefore requires deep and structural changes in how these systems are configured, involving behaviour, governance and regulation as much as technology.
Viable Cities was established as a Swedish strategic innovation programme in 2017 with a mission of climate-neutral cities by 2030, with a good life for all within planetary boundaries. Klimatkontrakt 2030, the Climate City Contract, is our central instrument. Through the contract, the mayors of 48 municipalities make an annual commitment to the national government on how they will work towards climate neutrality.
Experience from this work, and from research on transformative innovation policy, points to a persistent gap between transformative ambitions and the practices through which programmes are designed, funded, implemented and evaluated. Much innovation funding is still organised as discrete, time-limited projects with predefined deliverables, and the resulting fragmentation can leave individual solutions piecemeal when viewed from the perspective of the system as a whole. System demonstrators, developed by Vinnova, Viable Cities and the Swedish Energy Agency from 2022, were designed to address this gap. They take a portfolio approach, combining interventions across several dimensions of an urban system, and they treat the programme itself as something to be developed through continuous dialogue and learning between funders, cities and innovators.
We publish this blueprint openly in the hope that it will support those designing such programmes in other contexts, and that what they learn will in turn inform the further development of the method. We particularly want to share our learning with those able and willing to change the rules and structures shaping urban systems and to inform decisions on policy, investment, procurement and institutional practice. This connection between learning and decision-making is essential if effective approaches are to be adopted and sustained beyond the original demonstrator.
I would like to thank Vinnova, the Swedish Energy Agency and the cities and partners who took part in the Swedish programme and the Climate Smart Cities Challenge, as well as Dark Matter Labs and the many organisations that contributed to this blueprint.
Olga Kordas
Programme Director, Viable Cities
Foreword from the Viability Fund for Cities
Cities need substantial additional finance to deliver the climate transition. Mobilising that finance also requires stronger connections between city priorities, national policy, investment decisions and market demand. These connections are central to the Viability Fund for Cities, launched by Viable Cities at COP30 in Belém in November 2025.
System demonstrators offer a practical way to make those connections. They show that when we bring together all the relevant actors and work across technology, regulation, governance, behaviour and finance, we can achieve urban systems change. They also show the importance of making long-term institutional changes.
This blueprint draws on the Swedish system demonstrator programme and the Climate Smart Cities Challenge. Developed through dialogue with funders, international organisations and city partners, it offers a shared starting point for designing similar programmes. The method is still being developed and applying it more widely will help us understand where it works, what needs adapting and what support cities require.
The Viability Fund for Cities is being developed around three segments. The first is Align, which improves coordination between funders and programme partners to de-risk financing. The second is Co-finance, which develops local climate investment structures and catalytic financing partnerships that can connect system demonstrator portfolios to implementation. The third is Demand, which supports coordinated public and private purchasing and joint investments, including through collaboration with First Mover Cities, to support the creation of credible markets for climate solutions.
These pathways need to be considered from the outset. Buyers can help define what should be demonstrated, while financing partners can clarify the evidence and arrangements needed for investment. Some interventions will require sustained public funding while others may attract commercial capital. Programme design should make these different needs visible.
Country platforms and multilevel governance arrangements can connect this work to decisions beyond the city, helping address barriers that local actors cannot resolve alone. In this way, the blueprint contributes to Sweden’s engagement in the Coalition for High Ambition Multilevel Partnerships (CHAMP) and to connecting national climate commitments with delivery in cities.
We invite funders, governments, cities and implementation partners to apply and refine this blueprint with us: to develop innovative, climate-smart programmes, identify credible financing and procurement pathways, and share what they learn. Our aim is to help make successful approaches easier to finance, adopt and sustain across different cities and countries.
Olle Dierks
Sweden’s Focal Point for CHAMP and Lead for the Viability Fund for Cities
Chapter 1. Urban system demonstrators
Cities are best understood as systems of interconnected systems. The way people move, how public and private actors interact, how assets and utilities are managed and buildings are heated and cooled, where energy comes from, how land is used and how goods and waste flow through a city are closely linked, to each other and to the regions, countries and global networks on which cities depend. This interconnection helps explain why change in cities is difficult. Existing infrastructure, institutions and behaviour tend to reinforce one another, creating what Seto and colleagues call carbon lock-in: mutually reinforcing physical, economic and social constraints that slow the rate at which emissions can fall (Seto et al. 2016). Transitions research describes the result as a socio-technical regime, in which rules and norms, networks of actors and physical infrastructure are so closely coupled that new solutions struggle to gain a foothold (Geels 2002).
Changing such a system involves reconfiguring the relationships between technologies, infrastructure, regulation, business models and the roles, behaviour and expectations of all actors involved. Better technologies are part of this, but on their own they tend to be absorbed by the existing system without changing it. Innovation policy has increasingly recognised this. Schot and Steinmueller describe a shift from policies that fund research and development, through policies that strengthen national innovation systems, towards policies aimed at transforming the socio-technical systems that underlie problems such as climate change (Schot and Steinmueller 2018). Such transformations are long-term, involve many actors with different interests and deal with problems whose definition shifts as understanding grows, so they cannot be planned in detail from the outset.
Cities have sought to change their systems through experimentation, testing new solutions in pilots, testbeds and living labs (Bulkeley and Castán Broto 2013). These approaches can generate valuable evidence and local capacity. The limitation arises when a test is treated as an end in itself: a successful technology or service may still lack the rules, finance, public support or institutional owner needed for adoption beyond the test site. A pilot can be a useful part of a wider transition, but evidence that a solution works in one setting does not by itself show how the surrounding urban system will change or guarantee that the solution will be adopted more widely.
Transforming urban systems therefore depends on a set of connected processes. These are: establishing a shared direction, mobilising the actors who hold the system in place, demonstrating change across several dimensions of a system at once and learning continuously as the work proceeds. Learning in this sense goes beyond asking whether things are being done well, to asking whether the right things are being done and why. Transformation also depends on what Wolfram calls urban transformative capacity, the ability of cities to change within and across the many socio-ecological and socio-technical systems embedded in them (Wolfram 2016).
Markets are central to this. According to the Mission Possible Partnership, cement and concrete alone account for around 8% of global carbon dioxide emissions and much of that demand originates in urban construction. Through their procurement and regulatory powers, cities can send demand signals far up the value chain, to producers who would otherwise have little reason to invest in lower-carbon alternatives. Initiatives such as the First Movers Coalition are needed to help scale the supply of low-carbon products and services through early and credible demand signals.
1.1 System demonstrators as a way to systems change
In 2020, Vinnova, the Swedish innovation agency, and Viable Cities, Sweden’s strategic innovation programme for climate-neutral and sustainable cities, started designing urban system demonstrators to help address these challenges. System demonstrators are a portfolio of mutually reinforcing interventions in a defined urban system, designed together with the actors who have the mandate and capacity to change how that system works. The system may be a geographically bounded area such as a district or neighbourhood, a thematic domain such as mobility or energy, or a combination of the two. System demonstrators operate at an intermediate scale, broader and more systemic than a pilot, yet bounded enough to be organised, implemented and learned from, which makes possible urban transitions that would otherwise be too large and diffuse to act on.
It is important to be realistic about what a system demonstrator can achieve. Systems change is slow, uncertain and shaped by factors that no single initiative controls. Building institutional capacity and trust between actors takes years, and earlier experience suggests that a single short grant period is unlikely to be enough. Some demonstrators may achieve significant shifts in how a system works, while others may deliver more modest progress or find that parts of their portfolio do not work as intended. Incremental change of this kind can still be an important step forward, and what a demonstrator learns about the barriers to change can be as valuable as what it achieves, provided that this learning reaches those with the power to remove the barriers. Programmes should therefore ideally define in advance who receives that learning and what they commit to do with it.
Vinnova and Viable Cities developed and tested the method through a sequence of funding calls between 2022 and 2024. Between 2021 and 2024, the approach was used in Bogotá, Bristol, Curitiba and Makindye Ssabagabo through the Climate Smart Cities Challenge, led by UN-Habitat and Viable Cities. The method also builds on EIT Climate-KIC’s Deep Demonstrators, which from 2019 worked with an initial cohort of 15 European city governments in the Healthy, Clean Cities programme, with Dark Matter Labs among the lead partners.
1.2 Six dimensions of change
System demonstrators are designed to bring about change in six dimensions at the same time. They are briefly outlined here.
1. Business and value models, investment, procurement and market creation. This dimension relates to how value is created, shared and financed. It includes tariffs, pricing, procurement, aggregated demand, funding and financing instruments, risk-sharing arrangements such as blended finance structures and outcome-based contracts, citizen and community co-investment and mechanisms that create markets for climate-neutral solutions.
2. Policy and regulation. The formal rules, standards and incentives shaping the system, for example planning rules, transport and building codes, environmental standards, regulatory sandboxes and derogations.
3. Behaviour, culture and values. The habits, norms, narratives, trust and psychological safety that shape how actors behave and collaborate, for example resident practices, organisational cultures, cross-sector trust, sense-making and learning structures.
4. Infrastructure. The physical and social infrastructures that underpin the system, for example transport networks, energy grids, public space and social infrastructure such as schools and clinics.
5. Technology, products and processes. The concrete services, tools and workflows that run on that infrastructure, for example mobility services, retrofit delivery chains, data platforms and operational procedures in agencies or utilities.
6. Governance and decision-making. How responsibilities, mandates and decision rights are allocated and exercised across public, private and civic actors, for example climate city contracts, mission charters, cross-department teams, participatory budgets, civic contracts and community governance roles.
A system demonstrator works across these six dimensions together, focusing on how they combine to create a new system. From this perspective, cities are understood as actors capable of driving demand and shaping markets as well as places where solutions are implemented. By coordinating regulation, public procurement, private sector demand and investment decisions, cities can help create demand signals that have the potential to transform entire value chains. Residents and entrepreneurs are more than users of solutions or targets of behaviour change. They can take part in deciding on and financing the transition, since they often gain most from it and are asked to change most.
1.3 Five steps for implementing a system demonstrator
System demonstrators are implemented through five steps. The steps form an iterative cycle and may overlap or be revisited as new knowledge emerges. Continuous orchestration runs alongside all five steps.
A precondition: a committed challenge owner. Before the first step, a demonstrator needs a challenge owner, usually the city or a locally embedded multi-actor ecosystem, with the mandate, capacity and budget authority to act on the results. Without this, an administration short of capacity, time and mandate tends to fall back on isolated solutions and the portfolio becomes a list of projects.
1. Formulate the mission. Key actors co-create a mission for the system demonstrator, grounded in the urban challenge the programme addresses. The process builds shared understanding and collective commitment and the result is a mission that the public sector, private sector, academia and civil society align on.
2. Map and analyse the system. Participants carry out a joint mapping and analysis of the system across the six dimensions of change. The aim is a shared understanding of the system’s character, boundaries, underlying structures, key actors and existing innovations that can act as a starting point. The analysis should also show who invests, who benefits and who is asked to change behaviour. Even where the overall socioeconomic case for decarbonisation is positive, the municipality often carries net costs, while much of the benefit flows to others. Making this distribution visible helps explain why measures stall and why they should be considered as a package. The first analysis does not need to be comprehensive and can be refined as the work progresses. The result is a co-owned picture of the system that all participants can build on.
3. Identify structural barriers and transformation potential. Drawing on the analysis, participants jointly identify the structural barriers and the points where change is most possible. The result is a shared understanding of what is blocking change and where the potential lies.
4. Identify the system shift. Based on this understanding, participants identify the window of opportunity or fundamental shift (what we might call a “game changer”) that the demonstrator aims to unlock. A system shift describes the new organising principle, relationship or capability that could change how the system works if adopted more widely. It often takes the form of a new arrangement for sharing costs and value between actors, for example one that allows those who invest to recover part of the benefit they create for others. It helps extend the window of opportunity to related challenges and keeps the demonstrator focused on finding a pathway towards a new normal, beyond testing individual solutions.
5. Design and implement a portfolio of interventions. The actors then co-design a portfolio of interventions, plans and measures that together aim to shift the system. The measures are grounded in a theory of change that explains how they are expected to lead to the mission, and they are implemented in real urban conditions. Because individual measures differ in their costs and returns, the portfolio can combine stronger and weaker measures so that together they make a viable case. The result is visible action in the city that advances the mission. The portfolio should also identify how successful interventions can move beyond demonstration and be implemented at scale to create a new, sustainable “normal”. This includes mapping and addressing existing practices that must be changed to shift both norms and policies at the national level. It also requires mapping potential investment pathways, identifying where public finance can reduce risk, exploring private sector participation and identifying opportunities for aggregated demand.
Continuous orchestration. Organisations with different interests, mandates and ways of working are unlikely to hold together by themselves. An orchestration team, usually led by the city, coordinates the activities across all five steps. It keeps the organisations engaged, captures learning through regular feedback loops, guards against mission drift and helps build the partnerships needed to sustain a new normal. The results of orchestration include a plan for actor engagement, a framework for continuous learning, pathways for financing and investment, mechanisms for aggregating demand where relevant and a plan for scaling that includes commitments from participating actors.
———————————————————————————————————————-
Box 1: From demonstration to transformation: connection to finance and markets
Scaling requires connection to finance and markets, and investment often stalls because of the cost of going first. The first cities, suppliers, investors or households to adopt a new arrangement bear the costs of learning, such as higher unit costs, untested contracts and the absence of a track record, while much of the benefit, in lower costs and proven models, passes to those who follow. Each actor therefore has a reason to wait for another, even where the overall case for change is sound. Programmes can reduce this first-mover loss in several ways: by funding the learning share of early interventions explicitly, by sharing risk through guarantees or first-loss capital, and by aggregating demand across cities or buyers so that no single actor carries the early market alone. In return, what publicly funded first movers learn, including contracts, cost data and what did not work, should be made available to others, so that public support benefits the wider transition as well as the first mover.
System demonstrators should work on three complementary pathways from the outset, since investors look for a coherent portfolio and results that no one has planned to finance tend to stall. 1. The implementation pathway asks how new practices are embedded in governance, regulation and institutions, including where regional, national or EU rules, such as limits on municipal borrowing, stand in the way and how funders and public agencies can align their programmes behind them. 2. The investment pathway asks how successful solutions are translated into investment portfolios, local investment structures and catalytic co-financing that can bring in larger flows of public and private capital. 3. The market pathway asks how aggregated demand and procurement commitments can give suppliers and investors the certainty they need to take solutions to scale. It helps to distinguish learning capital, typically grants that fund experimentation and orchestration, from deployment capital that finances implementation at scale, and to plan for both from the first step.
———————————————————————————————————————-
Chapter 2. System demonstrators in practice: examples from Sweden, the UK and Colombia
This chapter describes three system demonstrators. CoAction Lund was one of the two funded through the Swedish programme. Bristol and Bogotá were implemented through the Climate Smart Cities Challenge, launched in 2021 by UN-Habitat and Viable Cities with Nesta Challenges, in which four cities defined their own climate challenges and an open innovation competition brought in organisations from around the world to address them.
2.1 CoAction Lund, Sweden
System and mission. CoAction Lund is in Brunnshög, one of Sweden’s most workplace-dense areas, with heavy commuter and freight traffic, high energy demand and limited grid capacity. The demonstrator addresses energy and mobility together and works towards climate neutrality by 2030. Its goals include a 90% reduction in transport emissions compared with 2010, less car use and a local energy system able to provide enough electricity for vehicles and businesses.
Orchestration and participants. The demonstrator is orchestrated by Lund municipality and brings together 36 organisations, including infrastructure providers, large employers, property owners and providers of new solutions.
Portfolio of interventions. The organisations are implementing more than 40 activities in energy and mobility, including Green Travel Plans, smart charging and local energy. Behaviour and culture have been central to the work. Green Travel Plans target commuting habits and organisational norms across major institutions in the area. A “future image” process with Dark Matter Labs, Climaginaries and Lund University co-created shared narratives of a desirable 2030.
System shift and game changer. CoAction’s system game changer centres on EnergyNet, a locally developed decentralised architecture for local electricity networks, modelled on the logic of the internet, which lets buildings, vehicles and local energy resources share renewable electricity with less need for conventional grid expansion. In the first installation, launched in Brunnshög in April 2025, a residential building is connected to a neighbouring mobility hub through what Viable Cities describes as the world’s first independent and locally owned parallel power cables, sharing surplus solar electricity. EnergyNet is built on open, interoperable standards, intended to support a transition from a centralised energy model towards local, distributed production.
CoAction Lund is being implemented at a time when European energy regulation is changing significantly, and EnergyNet shows how some of the new regulatory possibilities can work in practice at district scale. By testing EnergyNet, the demonstrator has been able to surface regulatory barriers and opportunities around grid codes, data sharing and local markets.
Results and scaling. The approach is now being extended to a residential area with 280 apartments in western Lund with the regional energy company Kraftringen and the technology provider ViaEuropa, and to other cities in Sweden. EnergyNet has also been identified as an investment opportunity within the Viability Fund for Cities.
2.2 Bristol Thriving Places, United Kingdom
System and mission. The Bristol demonstrator addressed affordable, zero-carbon housing on small brownfield sites that conventional development had treated as unviable. The mission, defined by Bristol City Council with its One City partners, aligned the council’s legal duty to prevent homelessness with its climate commitments.
Orchestration and participants. The demonstrator was orchestrated by Bristol City Council with the Bristol Housing Festival and delivered by a consortium called Thriving Places, led by the social housing developer EDAROTH and its parent company AtkinsRéalis. The consortium included housing associations, developers, energy and digital infrastructure providers, community engagement specialists, universities and government agencies.
Portfolio of interventions. The portfolio included the delivery of net-zero social rent homes on council-owned land, a toolkit for assessing value across several forms of capital, a discovery process on policy and regulation and a digital twin to model the viability of brownfield housing at scale. Consultation based on theatre and play involved residents and changed perceptions of what small, overlooked sites could become.
More than 100 small council-owned sites in good locations had stood undeveloped for years. The main barrier was regulatory. Under the rules governing how English local authorities balance their spending, the net present value model in Bristol’s Housing Revenue Account made small schemes fail appraisal individually. Offsite housing manufacturers could not engage because individual sites fell below their minimum order quantities, and planning and procurement processes were designed around large schemes. Site value was also assessed in narrowly financial terms that ignored social factors, including the £11 million a year the council was spending on temporary accommodation.
System shift and game changer. The demonstrator’s system shift was site aggregation. By treating a cluster of small sites as a single programme, the demonstrator created the scale needed to make building viable and changed the definition of what counted as viable development. Aggregation also addressed the demand side: individually, the sites fell below offsite manufacturers’ minimum order quantities, but together they formed a pipeline predictable enough to commit to. The council reviewed its treasury strategy to enable appraisal at programme level, a development agreement of around £10 million was signed through an existing national procurement framework, and a dedicated discovery process engaged stakeholders across government to distinguish real from perceived policy, regulatory and legal barriers.
Results and scaling. The demonstrator is delivering 29 net-zero social rent homes across five council-owned sites. The council’s Housing Revenue Account team is delivering them in partnership with EDAROTH. The Bristol Housing Festival published a national playbook for local authorities on delivering social rent housing using modern methods of construction, and the scheme was selected as a documented good practice for the 13th World Urban Forum.
The work has also informed national policy, inspiring the Social Housing Initiative, a cross-industry partnership convened by Lloyds Banking Group, whose concept for aggregating small sites the UK government took up as the Small Sites Aggregator. A pathfinder was trialled in Bristol, Sheffield and the London Borough of Lewisham, targeting around 1,000 homes on 60 sites, with a significant proportion intended for social rent. In 2026 the pilot was reported to be moving to national rollout, with the government indicating that the model could support up to 10,000 homes a year.
2.3 Green Routes, Bogotá, Colombia
System and mission. Bogotá’s demonstrator addressed urban freight. More than 67,000 trucks and vans, over 70% of them owned by small fleet operators, travel the city’s streets every day, adding to congestion and emitting around 850,000 tonnes of CO2 and over 700 tonnes of fine particulate matter a year. The city’s call to action asked for business models, services and technologies that could improve freight mobility and reduce emissions from logistics by roughly 100,000 tonnes of CO2 and 100 tonnes of fine particulate matter by 2024.
Orchestration and participants. The demonstrator was orchestrated through the Urban Logistics Network, a platform led by the city’s Secretariat of Mobility that brings together freight operators, shippers and public agencies in collaboration with the Secretariat of Environment, which leads the city’s Urban Zones for Better Air programme. Green Routes, a consortium of technology companies formed through the Climate Smart Cities Challenge, developed the technical platform at the heart of the work.
Portfolio of interventions. The Green Routes platform connects to vehicle GPS systems and optimises freight routes in real time. It sits within a connected portfolio that includes vehicle emissions labelling and circulation rules, investment in loading and unloading areas, an environmental self-regulation programme and sustainable driving guidelines for operators, and a proposed district freight fund to finance cleaner logistics.
System shift and game changer. The demonstrator’s system shift is a shared evidence base for freight. Because freight data sits inside individual companies, the city has never been able to plan logistics at citywide scale, and operators cannot optimise a system they cannot see. A data governance and sharing agreement is being negotiated, which, if it succeeds, will give the city real-time knowledge of how goods move through its streets to inform regulation and allocate road space and give logistics companies shared optimisation and insight.
Results and scaling. Results so far are at pilot scale. With two freight companies, Green Routes generated more than 108 optimised routes for 1,416 transport requests from 175 vehicles. It also worked with the Urban Logistics Network and the Bogotá Logistics Cluster and developed business models based on subscriptions and a digital marketplace. The lessons from the demonstrator have been aligned with the city’s Urban Zones for Better Air policy and Bogotá has proposed these zones as the basis for its next system demonstrator.
Box 2 · Stockholm, SwedenGreenhouse Sthlm – what a private developer can demonstrate
57% lower carbon footprint
First construction phase compared with the NollCO2 reference building.
Electrolux Group is turning its headquarters site in Stadshagen, western Kungsholmen, into a mixed-use neighbourhood. The project shows what a private developer can coordinate across construction, energy and everyday services on one site. It brings low-carbon construction, energy measures, housing, workplaces and shared resources together in one mixed-use area with the mission to help lower the climate impact of everyone living and working there, including the impact of the buildings and everyday life in the area.
The initiative is orchestrated by Electrolux Group and brings together various public and private partners including the City of Stockholm, Skanska, Hedström & Taube which carried out certification and carbon calculations, the Sweden Green Building Council and Stockholm Exergi and Stockholm Gas as energy suppliers. It combines a wide range of low-carbon measures including low-carbon construction, local reuse of building materials, local energy production and fireplaces powered by biogas produced partly from food waste. Residents share spaces and resources, including a sewing machine in the laundry lounge so people can repair their clothes. The area is also designed around the 15-minute city concept.
The development shows that low-carbon solutions are available and ready to use today. From the start, the aim has been to share knowledge, analyses and data openly, so that other cities and developers can move faster on low-carbon construction. The first phase (about 16,000 sqm of offices and housing) was built with a carbon footprint 57% lower than the reference building defined in the Sweden Green Building Council’s NollCO2 (ZeroCO2) certification.
Greenhouse Sthlm could be the starting point for a system demonstrator that helps create similar areas in other cities, in Sweden and internationally. It could also give decision-makers a basis grounded in implemented and verified solutions, Environmental Product Declarations (EPDs) and carbon footprint calculations, and help identify what evidence other cities and developers need before they act.
——–
Chapter 3. Designing and funding system demonstrator programmes
This chapter is for organisations designing system demonstrator programmes and the funding behind them, including grant calls. It describes the Swedish programme and then sets out a model based on that experience, including the main design considerations a programme will need to address in its own context.
3.1 The Swedish system demonstrator programme
Vinnova, Viable Cities and the Swedish Energy Agency designed system demonstrators as a new funding instrument for climate-neutral cities. The programme was linked to Klimatkontrakt 2030 (Climate City Contract 2030), a long-term framework for multilevel climate governance in which Swedish municipalities work with business, academia, civil society and six national agencies towards a shared mission of climate-neutral cities by 2030 with a good life for all within planetary boundaries. The political leadership of each participating municipality signs a contract setting out the city’s most important areas of transition and each city commits to developing a portfolio of initiatives, a climate investment plan and a dedicated innovation team or transition function along with a “transition arena” in which stakeholders can interact and co-develop new initiatives. System demonstrators were designed to strengthen this work, so each demonstrator had to align with its city’s contract and climate investment plan and link its orchestration team to the city’s transition function.
Because the instrument was new, the programme set out to build the cities’ readiness and develop the method itself at the same time. It ran as three calls between 2022 and 2024, each open only to cities that had completed the previous phase, with each producing the outputs the next depended on. Throughout, Vinnova and Viable Cities developed the concept with the cities through workshops, dialogue and continuously updated guidance.
Table 3.1: Overview of the Swedish system demonstrator programme
| Phase | Period | Duration | Maximum grant | Grant rate | Eligibility | Funded |
|---|---|---|---|---|---|---|
| Design phase | September 2022 to February 2023 | About six months | SEK 300,000 (about €28,000) | Up to 80% | The nine cities that first signed a Climate City Contract, with the city as coordinator | Six projects |
| Planning phase | Autumn 2023 to mid-2024 | About eight months | SEK 1 million (about €93,000) | Up to 50% | Cities that had completed the design phase and signed the contract in 2020, 2021 and 2022; a consortium of at least four parties; a letter of intent from the city's political leadership | Two consortia |
| Implementation phase | June 2024 to December 2026 | Two years, later extended | SEK 20 million (about €1.8 million) over two years | Up to 50% | Only the two consortia that had completed the planning phase | Two demonstrators |
Six of the nine cities that had first signed a Climate City Contract received design-phase grants of up to SEK 300,000 (about €28,000) for six months to design the system demonstrator, mobilise actors, identify policy barriers and deepen their understanding of the system. The planning phase, open only to cities that had completed the design phase, put in place the processes, structures and functions needed for a full-scale system demonstrator. Each city had to coordinate a consortium of at least four parties, including business, academia and civil society, and submit a letter of intent signed by its political leadership. Two consortia received up to SEK 1 million (about €93,000) each for a period of eight months. By the end they were expected to have a co-created mission, an orchestration team, a description of the system and its structural barriers, a portfolio plan grounded in a theory of change, and plans for actor engagement, learning, scaling, digitalisation and long-term financing.
The implementation phase was open only to the two consortia that had completed the planning phase. The implementation call opened while the planning phase was still under way, to avoid a funding gap. Each received up to SEK 20 million (about €1.8 million) over two years, matched by the city and its partners, for a total budget of around SEK 40 million (about €3.6 million).
Alongside the grants, Vinnova, Viable Cities and the Swedish Energy Agency followed the demonstrators closely and provided support on financing and investment, citizen and actor engagement, digitalisation, governance, policy and regulation, and communication. Dark Matter Labs was contracted to build the capacity of the participating cities. In addition, Vinnova commissioned accompanying research, in which university researchers followed both demonstrators and the programme, facilitating regular reflection and helping both the demonstrators and the funders to adapt their work as it progressed.
The programme resulted in two system demonstrators, in Lund and Stockholm, funded from mid-2024 to the end of 2026. CoAction Lund, described in Chapter 2, integrates energy and mobility in the Brunnshög district and now brings together 36 organisations around more than 40 activities. STOLT in Stockholm works towards an emission-free inner city across the city centre and the old town, and began its implementation phase with 20 partners and five demonstration projects.
3.2 The programme model
Table 3.2 sets out the main elements of a system demonstrator programme.
Table 3.2: System demonstrator programme model
| Element | What it needs to achieve | Main design considerations |
|---|---|---|
| Anchoring in existing multilevel governance commitments | Connect the demonstrator to political commitments, existing plans and multilevel governance frameworks, such as climate city contracts or other CHAMP-aligned arrangements, so that what it learns can influence wider change | Which framework to anchor to and the role of national counterparts; selection route (invited, open call or screening of an existing portfolio), assessment criteria and process |
| Stage 1: defining the system and the mission | Give cities time and modest resources to define the system, formulate a mission and test political commitment | Place, domain or both; theme set by the programme or left open |
| Stage 2: building the demonstrator | Assemble the actor constellation, establish the orchestration team, identify the system shift and design a portfolio of interventions, giving the funder assurance before larger investment | How the actor constellation is assembled; who holds the grant; readiness required before implementation and entry points for more advanced cities |
| Stage 3: implementation, investment and scaling | Implement the portfolio iteratively in real conditions, connect it to investment and procurement and plan for scaling from the start | How far the programme itself supports investment, project preparation and aggregated demand, recognising that not all projects in a portfolio will have investment potential. |
| Support across the programme | Provide method guidance, specialist expertise and connections that individual cities cannot organise alone, shaped by their needs | Where the support function sits and how it is resourced |
| Learning and accompanying research | Build learning into every stage, within each demonstrator and at programme level | How learning-oriented research sits alongside evaluation for accountability |
| What the grant can fund | Fund the orchestration, analysis, coordination and learning that have no other natural funder | Funding instrument; grant rates and co-financing rules; budget ceilings; co-financing ambition at portfolio level |
| Conditions and safeguards | Ensure that the costs and benefits of change are fairly distributed and that risks to communities are managed | Conditions attached to funding; risk screening and grievance mechanisms; reporting that recognises adaptation |
| Offer to cities and commitments | Align expectations between the programme and participating cities from the start | What the programme offers and what it requires in return |
| Roles | Give each function of the programme a clear owner | How functions are distributed among funders, support organisations, cities, partners and researchers |
3.2.1 Anchoring the programme in existing commitments
A system demonstrator needs an anchor in city commitments and a route to decisions beyond the city. In a CHAMP-endorsing country, it can serve as a delivery function within the country-led arrangements set out in the CHAMP Implementation Roadmap 2026–2028, in which cities define priorities and implement portfolios, while national ministries, agencies and finance actors help remove barriers, align climate investment plans with subnational priorities and coordinate project preparation. Where a country platform or similar national coordination structure exists, the demonstrator can connect to it (CHAMP 2026).
In Sweden, the anchor was Klimatkontrakt 2030. Participating cities had already committed publicly to climate neutrality, set up a dedicated team to lead their transition work and begun developing climate investment plans covering both municipal and private investment. Six national agencies were part of the same framework and were expected to become increasingly involved in the demonstrators through funding, expertise and support for scaling.
In the Climate Smart Cities Challenge, each city’s demonstrator was tied to an existing plan or commitment. Bogotá’s was linked to the emission targets in its Climate Action Plan. Bristol’s was linked to its One City Climate Strategy and its aim of building 24,000 new affordable homes by 2050. Makindye Ssabagabo’s was linked to a green homes plan approved by the municipal council and to its emerging Sustainable Energy Access and Climate Action Plan. Curitiba’s was linked to PlanClima, the municipal climate plan established after the city revised its master plan in 2015 to incorporate climate change. Curitiba also anchored the work inside its own administration. The mayor established a cross-functional climate committee by decree, bringing together the environment secretariat, the urban planning institute, the food security secretariat and the city’s development agency, and the committee supported the demonstrator throughout. In other contexts, the anchor could be a national urban programme, a city climate action plan, a subnational development strategy or an existing portfolio of multilateral programmes.
A programme should specify the route from the demonstrator portfolio to a national and local investment pipeline. For each prospective investment, the city and its partners can record the expected climate and social outcomes, delivery owner, costs and stage of preparation, regulatory or institutional barrier, likely buyers, potential financiers and next decision. A country platform or equivalent forum can review the portfolio with the city, finance ministry or relevant agencies, project preparation providers and financial institutions. The resulting decisions can inform national investment priorities, financing instruments and policy reform while allowing cities to retain ownership of their missions and local implementation.
Design considerations. How cities are selected determines much of what follows, because systems change depends on political will and institutional capacity that a programme can strengthen but rarely create from nothing. The Swedish programme used an invited route, working only with cities that had already committed to climate neutrality through Klimatkontrakt 2030 and narrowing the field at each phase. This built on commitment that was already present, but it also meant that the programme worked with cities that were among the most advanced in the country, and a programme designed this way may widen the gap between leading cities and the rest. The Climate Smart Cities Challenge began with an open call, which drew 58 entries from 54 cities in 35 countries, from which four were selected. An open call can surface ambition in unexpected places, although many applicants may not yet be ready for work of this kind, and assessing them takes considerable resources. A third route, likely to suit development banks and multilateral funds, is to screen cities in an existing portfolio of programmes and invite a few to express interest. This can build on established investment relationships, which may later prove valuable when demonstrators seek finance for implementation.
The assessment criteria also signal what the programme values. The Swedish programme assessed applications against three criteria: potential, actors and feasibility. It weighted potential at 40% in the design and planning phases, when the ambition and systemic quality of the idea mattered most, and all three equally in the implementation phase, when the capacity of the orchestration team and the credibility of the delivery plan had become just as important. External experts assessed the applications alongside staff from Vinnova and Viable Cities, and interviews were held with shortlisted applicants in the planning phase and with all applicants in the implementation phase. Interviews help judge orchestration capacity and political commitment, which can be difficult to assess from a written application. Chapter 4 sets out sample assessment criteria that programmes can adapt.
3.2.2 Stage 1: defining the system and the mission
A system demonstrator requires a city to work in ways it may not have tried before, across departments and with many external organisations. The first stage should therefore give cities time and modest resources to choose the system and formulate the mission. In the Swedish calls, the deciding factor in choosing a system was its potential to create a new normal locally, nationally and internationally.
A demonstrator is likely to cut across housing, transport, digitalisation, law and procurement, so cities in the Swedish design phase were encouraged to form a cross-departmental team with broad innovation capacity and a clear mandate. Vinnova and Viable Cities also ran workshops with the cities and external experts, developing the approach jointly while the cities worked on their proposals.
The mission needs to be concrete enough for other organisations to see what they are being asked to contribute to. In the Climate Smart Cities Challenge, each city published a call to action, some with quantified targets. Bogotá asked for ways to cut emissions from freight transport by roughly 100,000 tonnes of CO2 and 100 tonnes of fine particulate matter by 2024, while Bristol sought a new appraisal and financing model for affordable, zero-carbon homes.
This stage is also an early test of genuine political commitment. In Sweden, a letter of intent signed by the chair of the municipal executive board gave each demonstrator a visible political mandate.
Design considerations. The way a system is defined determines which barriers become visible and which actors need to be involved. A place-based demonstrator lets the dimensions of change interact in one location, where residents can experience the results and where energy, mobility, housing and public space can be worked on together. A domain-based demonstrator, addressing a single system such as freight or construction across several places, is often better placed to reach the rules, markets and value chains that operate beyond any one neighbourhood. The Swedish design phase allowed both, requiring domain-based demonstrators to involve two or more cities together with national or regional partners, and by the implementation phase the programme defined the system as a bounded place combined with one or more connected themes.
A related consideration is whether the theme is set by the programme or left open. The Swedish programme left the theme open within the overall mission of climate-neutral cities, and in the Climate Smart Cities Challenge each city chose its own challenge. Leaving the theme open allows each city to work where local energy and political commitment are strongest. Setting it at programme level, for example circular construction or urban water, can align the demonstrators with a national priority, make comparison and shared learning between them more meaningful and open the possibility of aggregating demand across cities, which may matter for systems such as construction materials where individual cities have limited market influence.
3.2.3 Stage 2: building the system demonstrator
Before committing substantial implementation funding, a programme needs some assurance that a demonstrator has the organisations, structures and plans to deliver and the second stage puts these in place.
Because systems change depends on organisations able to influence how the system works, the central task in this stage is to assemble the actor constellation. Its composition should follow from what the demonstrator is trying to achieve, and each organisation’s role should be clear. Noting that civil society organisations have often been brought in late, the Swedish calls asked demonstrators to involve them from the start. Each demonstrator also needs an orchestration team. In Sweden, this was expected to combine expertise in climate, process design, digitalisation, financing and communication, and to work with the city’s transition team so that the demonstrator strengthened the city’s wider climate work.
Working together, the organisations carry out the mapping and analysis described in Chapter 1, identify the structural barriers and transformation potential, identify the system shift the demonstrator aims to unlock and design a portfolio of interventions grounded in a theory of change. The outputs required at the end of the Swedish planning phase, listed in section 3.1, gave the funders a basis for judging whether a demonstrator was ready to justify a substantially larger investment.
Design considerations. How the actor constellation is assembled shapes what kind of change a demonstrator is able to pursue. In the Swedish programme, each city convened its own consortium, drawing on organisations that already held influence over the system, and Stockholm later opened its demonstrator to further organisations through its own calls for demonstration projects. The Climate Smart Cities Challenge took a different route, assembling each constellation largely through an open innovation competition built around the city’s challenge, which attracted 179 applications from 29 countries and resulted in one winning consortium per city. A constellation convened by the city starts with mandate and established relationships, which are often what systems change depends on, but it may also reproduce the networks and assumptions that hold the current system in place. A competition can bring new capabilities and perspectives into the system. There is, however, a risk that the demonstrator becomes organised around a single solution, and the incoming organisations are likely to need time and support before they can influence regulation, investment or procurement. A city-convened core that opens up to new organisations as the portfolio develops may capture some of the strengths of both.
Closely connected is the question of who holds the grant, since the organisation that controls the funding also holds much of the power to orchestrate. In the Swedish programme, funding went to the city-led consortium, with each member funded under the rules that applied to its type of organisation, which kept the city at the centre of the demonstrator. In the Climate Smart Cities Challenge, planning funding went to the winning consortium in each city, which then worked with the city to develop the demonstrator. This moved resources quickly to the organisations developing and testing new solutions, although it may leave the city in the position of a host, with less ability to steer the portfolio towards the wider system. Where legal or financial rules make it difficult to fund certain types of organisation, letters of commitment and clearly defined roles may partly substitute for funded membership, although funded partners tend to be more engaged and more clearly accountable.
The step from building a demonstrator to implementing it is also where a programme needs to decide how much readiness to require. A phased structure with defined outputs gives the funder growing confidence before committing larger sums and allows trust between the participating organisations to develop, which is often a precondition for the harder work of changing rules and investment patterns. Long preparation also carries costs, since momentum can fade and political windows can close while a demonstrator waits for funding. Where funding cycles, procurement rules or political timelines make separate phases impractical, some of the same benefits can be retained within a single award by tying the release of funding tranches to the completion of planning outputs. Cities also start from different levels of readiness, and a programme may allow more advanced cities to enter at a later stage. The readiness ladder in Chapter 5 is designed to help judge where a city is starting from and what kind of support would help it progress.
3.2.4 Stage 3: implementation, investment and scaling
In the third stage the demonstrator delivers its portfolio in real urban conditions. Since the purpose is to learn how the system can change, the work needs to be iterative. In the Swedish programme, the steps of the method did not have to follow a strict sequence, the portfolio was expected to change as knowledge accumulated and organisations could join or leave the consortium.
Implementation and investment need to be planned together from the outset, since the grant is unlikely to cover the full cost of the interventions themselves. In Sweden, demonstrators were expected to connect their portfolios to the city’s climate investment plan and set out financing needs that potential funders could act on. Viable Cities undertook to explore further funding sources, give the demonstrators opportunities to present their needs to financial institutions and develop the Viability Fund for Cities as a new platform to mobilise capital for climate-neutral cities.
Scaling also depends on demand. Suppliers and investors tend to commit to new solutions only when they can see a credible and large enough market, and in many cities demand is fragmented across departments and disconnected from private purchasing. Procurement is therefore often where proven solutions stall (World Economic Forum 2026).
One response is to aggregate demand, coordinating several buyers’ purchasing so that they send suppliers a stronger, more predictable signal while each keeps its own budget and contracts. This can happen within a city, by combining the city’s procurement with that of developers, property owners and large employers, or across cities that share a priority. The Cities Climate Finance Leadership Alliance describes how cities can do this: by acting as a market facilitator, setting material-based or performance-based mandates across public and private projects and using award criteria that reward lower-carbon tenders (CCFLA 2025). Stockholm, for example, reports a 70% emissions reduction after introducing carbon accounting as an evaluation criterion in a competitive dialogue. Stockholm, Oslo, San Francisco, Boston and Belém are among the cities now exploring innovative procurement models for low-carbon construction through the World Economic Forum’s First Mover Cities workstream (World Economic Forum 2026).
A demonstrator can test solutions in real conditions and show which procurement changes are needed to adopt them, and coordinated demand can then give suppliers the confidence to scale them. In Sweden, work began on how networks of public buyers could draw on the demonstrators’ insights. The Climate Smart Cities Challenge found that demonstrators risk operating in isolation unless those running them are connected to the city’s procurement teams.
To help establish a new normal, scaling needs to be planned from the start. The Swedish calls asked demonstrators to share and scale what they learned both about their own system and about system demonstrators as a way of working, within the city, nationally and internationally. The other Climate City Contract cities were a natural first audience, and the demonstrators reported regularly at Transition Lab Forum, the recurring conference of the contract cities. The Chapter 2 cases show two routes: national policy in Bristol and the spread of EnergyNet from Lund to other districts and cities. To create impact beyond the original demonstrators, other cities and organisations need to learn, adapt, adopt and implement in their own contexts. These early adopters need support with their own change processes, including the institutional, financial and procurement conditions for implementation. These followers are essential, but their role and support needs are often overlooked, which makes scaling unnecessarily slow and limits potential impact.
The funders also recognised that systems change takes longer than a typical project cycle. Grants were expected to cover roughly a demonstrator’s first three to four years, after which other financing would need to take over, although the funders indicated that further support might follow if needed.
Design considerations. The move from demonstration to financed implementation and scaling is where many promising initiatives stall. A grant can pay for the orchestration and development work, but the interventions that change a system, such as new infrastructure, housing or energy networks, usually require capital on a different scale and from different sources. In both the Swedish programme and the Climate Smart Cities Challenge, securing that capital appears to have been left largely to the demonstrators, supported by the programme partners, and the Climate Smart Cities Challenge treated implementation and fundraising as a single stage. Since investment flows are themselves part of the system a demonstrator is trying to change, a programme may choose to treat investment as a core function of its design. This could include support for preparing projects to the standards that development banks and investors require. It could also include local investment structures that prepare and aggregate projects into portfolios large enough to attract finance and that combine public, philanthropic, development and private capital, or links to an existing fund or investment operation. Such functions can sit within the programme or with a partner organisation. How far a programme goes is likely to depend on how capital-intensive the demonstrators’ portfolios are, which financing institutions are active in the context and whether the programme’s own funders are in a position to invest.
For a CHAMP-aligned programme, this investment work should be designed with the relevant country platform or national counterparts and a city-level investment function. The latter may be a local climate investment fund, an existing municipal financing vehicle or another structure suited to local law and capacity. Its task is to keep the portfolio visible, package and sequence projects, coordinate preparation and connect suitable financing to real delivery decisions. The demonstrator grant can finance orchestration, evidence and preparation; the programme should specify which institution can later commit capital and on what terms. A pipeline is credible when named actors can advance each opportunity through preparation and investment decisions.
A programme can strengthen the market route by giving city buyers a formal role in priority setting and portfolio reviews, and by engaging public and private purchasers early in the actor constellation. First Mover Cities and similar initiatives can bring several cities together around common performance needs and procurement requirements in areas such as low-carbon construction materials. The resulting demand signal can guide the demonstrator towards the standards, business models, financing and supply constraints that prevent purchasing at scale. Buyer involvement should be transparent and open to competition, and support for specifications, award criteria and contracts should respect applicable procurement law. Funders should assess whether the proposed purchasing route is plausible, without requiring a binding order before the demonstrator has generated the evidence buyers need.
3.2.5 Support across the programme
Each demonstrator has its own orchestration team, but cities are likely to need support that none could easily organise alone, such as method guidance, specialist expertise and connections to finance and national policy. The programme therefore needs a support function.
Programme support is also needed for cities and organisations preparing to adopt and adapt the demonstrators’ results. Facilitated peer learning, reusable implementation material and targeted assistance can help them act on the learning, while reducing dependence on the pioneer teams. A country platform or programme support function can organise this exchange across cities.
In Sweden, support was available at every stage. In the design phase, applicants could book one or two guidance conversations with Vinnova and Viable Cities, alongside the workshops with external experts. Viable Cities also developed shared support on climate investment plans, citizen engagement, digitalisation and policy, and during implementation support covered the six areas listed in section 3.1. Digitalisation expertise came from the Urban Twin Transition Center, a Vinnova-funded initiative led by the Swedish Internet Foundation, the University of Gothenburg and the research institute RISE.
The Swedish programme shaped its support around the needs the demonstrators reported through a regular survey during the planning phase and through continuous dialogue during the implementation phase. The funders also asked to be informed about, and involved in, important choices and trade-offs, acting as partners in each demonstrator as well as financiers. During the implementation phase, part of the programme support focused on developing methods and providing arenas for sharing lessons with actors beyond the system demonstrators, to enable further adoption and implementation. Light-touch support for followers, through facilitated peer-to-peer learning and exchange of experience, improved implementation rates and reduced the risk of the pioneers becoming a bottleneck for knowledge and experience.
Support may also need to reach the organisations joining a demonstrator. In the Climate Smart Cities Challenge, shortlisted organisations received technical support, direct access to the city teams, guidance on finding data and introductions to local stakeholders. Senior coaches from Ignite Sweden, a national programme connecting start-ups with large organisations, met them one to one while they formed teams, and Dark Matter Labs supported both the organisations and the cities.
International and local support should be built around city needs and decisions. Depending on place and mandate, organisations such as WRI, C40 Cities, the Global Covenant of Mayors, ICLEI and UNEP can work with local partners on methods, data, peer exchange, procurement, finance and implementation capacity, and UN-Habitat, as the UN’s urban agency, can connect city and national governments with development and technical partners. A programme should agree these roles with city and national counterparts, fund sustained local support and time assistance to the moments when missions, tenders and investment decisions are being made.
3.2.6 Learning and accompanying research
One purpose of a system demonstrator is to find out how a system can change and make that knowledge available to others, so learning needs to be built into every stage. Each Swedish demonstrator was required to have a learning plan that covered what did not work as well as what did and to share its challenges and insights openly so that others could follow the work.
Learning also needs to happen at programme level. In Sweden, Vinnova commissioned accompanying research, in which researchers work alongside those running the programme and the demonstrators, observing, facilitating reflection and feeding insights back while the work is under way. The demonstrators were expected to share data with the researchers and open up their processes to them. The researchers held regular reflection sessions with each demonstrator, with both together and with the funders, fitting them into existing meetings and routines, and the funders used them to adjust the design of the programme.
Design considerations. Most funders require evaluation that asks whether agreed results have been delivered. In systems change, however, the original plan is expected to change as the demonstrator learns, and evaluation that measures progress only against that plan risks penalising the very adaptation the method depends on. Learning-oriented research of the kind used in Sweden and evaluation for accountability serve different purposes and can complement each other, but they need to be planned together, so that demonstrators are not asked to report twice in different ways and so that adaptation is recognised as progress. Accompanying research was well established in Sweden, where funders were familiar with it and willing to fund it. In contexts where evaluation is more strongly oriented towards accountability, securing the mandate and resources for this kind of learning may require deliberate effort from the start.
3.2.7 What the grant can fund
Much of the work that makes a system demonstrator possible, such as analysing the system, coordinating organisations and capturing learning, has no obvious funder, and this is likely to be where a programme grant is most useful. Swedish grants covered staff time, consultants, method development, process management and communication, with EU state aid rules setting which costs were eligible and at what rate, while large investments in infrastructure or buildings had to be financed elsewhere. Grant rates fell from up to 80% in the design phase to up to 50% later, so organisations carried a growing share of the cost as their demonstrators matured.
Programme budgets should also provide for facilitated peer learning and targeted support to cities and organisations adopting the demonstrators’ results. This support should help prospective adopters assess local conditions, adapt relevant approaches and prepare implementation and financing decisions.
Design considerations. The choice of funding instrument largely determines who can be funded, at what rate and under which rules, and therefore which kinds of organisation can take part on equal terms. The Swedish programme used grants under EU state aid rules. Other programmes may use technical assistance funded by a development bank, grants passed through from national programmes or funding linked to a wider investment operation.
Within any instrument, the balance between grant and co-financing affects who is able to participate. Grant rates set too low in the early, exploratory stages are likely to exclude cities and public bodies with constrained budgets, which may be precisely those with the most to gain, while lower rates in implementation can signal genuine commitment once the demonstrator has proved its value. Many municipalities will find cash co-financing difficult, so the definition of eligible co-financing, including whether staff time and in-kind contributions count, needs to be clear and verifiable. Budget ceilings need to reflect what the work actually costs locally, and programmes working with cities of very different means may consider differentiated requirements. Where the aim is to mobilise much larger investment, co-financing ambitions can be set at portfolio level, as the Global Environment Facility does in its Sustainable Cities Integrated Program, treating the grant as seed funding for wider investment.
3.2.8 Conditions and safeguards
A programme that funds interventions in real urban environments carries responsibilities beyond its thematic purpose, since changing a system redistributes costs and benefits unevenly. The Swedish programme required gender equality to be addressed both in who took part and had influence and in the substance of the work, and assessed it in selection. It also required scientific outputs to be published open access.
Design considerations. Conditions attached to funding are part of the programme’s design, since they shape who benefits from change and whose voices influence it. Where interventions may affect vulnerable communities or livelihoods, particularly in rapidly growing cities with informal settlements or weaker planning systems, a programme is likely to need a process for screening environmental and social risks before funding is released and a grievance mechanism through which affected communities can raise concerns. The Global Environment Facility’s Environmental and Social Safeguards framework is one well-tested reference. Reporting requirements also need to fit the iterative nature of the method. A demonstrator that has responded to new knowledge may look quite different after 18 months from what was planned at the start, so progress reports are likely to be most useful when they ask what has been learned and how the portfolio has changed, as well as what has been delivered.
3.2.9 Offer to cities and commitments
Setting out clearly what cities receive and what they commit is likely to help align expectations from the start. Drawing on the Swedish programme, the offer could include:
- phased funding for developing and running a demonstrator;
- method support and specialist expertise;
- opportunities to learn with other demonstrators and cities;
- insights from the accompanying research;
- visibility in national and international arenas;
- connections to financial institutions, public buyers and other partners.
In return, cities could be expected to provide:
- political commitment from the city’s leadership;
- co-funding in cash or in kind;
- an orchestration team with a clear mandate and links to the city’s wider transition work;
- organisations with real influence over the system;
- openness about challenges and results;
- active participation in shared learning and scaling.
3.2.10 Roles
Each function of the programme needs a clear owner. In Sweden, the funders, Vinnova and later the Swedish Energy Agency, designed and financed the calls, took funding decisions and followed the demonstrators. Viable Cities co-designed the programme, provided method support and convening and worked to mobilise further finance. Each city coordinated its demonstrator, held the political mandate and led the orchestration team, with partners from business, academia and civil society planning and implementing the interventions. Specialist partners such as the Urban Twin Transition Center and Dark Matter Labs provided targeted support, and the accompanying researchers facilitated learning at every level.
In other contexts these functions may be distributed differently, for example with a development bank, ministry or international organisation as funder and a city network or country platform providing method support.
Chapter 4. Sample assessment criteria
This chapter sets out sample assessment criteria that funders and programme designers can copy, adapt or use as a starting point for their own. They can be used to assess applications in an open call, or to guide selection where cities are invited or screened from an existing portfolio of programmes, as described in Chapter 3.
4.1 Mission and system boundary
The proposal sets out a specific, time-bound and measurable mission, for example “climate-neutral, just and resilient freight mobility in city X by 2035”, and defines the boundary of the system it addresses, such as housing retrofits in low-income districts, primary urban mobility or distributed energy.
4.2 Shared mandate, coalition and orchestration
The proposal has a documented city mandate, an orchestration team and a credible coalition across the system, including community representatives and actors able to act on key barriers. It names national or regional counterparts, or a country platform where one exists, and sets out how decisions and portfolio reviews will be made locally and nationally. Where market adoption is part of the mission, buyers take part, with procurement and grant decision rights kept clear.
4.3 Portfolio of interventions
The proposal sets out a portfolio of several mutually reinforcing interventions spanning at least three dimensions of change set out in section 1.2.
4.4 System shift
The proposal identifies the fundamental change or system game changer the demonstrator aims to unlock, such as a new governance model, financing mechanism, market structure, regulatory approach or relationship between actors, and explains what must change, beyond implementing individual solutions, for the mission to be achieved.
4.5 Potential for systemic scaling
The proposal describes a plausible route by which learning could change national frameworks or city practice, be replicated by other cities, attract investment beyond the grant and, where suitable, be adopted through aggregated demand. It identifies who would take each scaling decision and what evidence they would need, and its replication plan specifies what can be transferred, the conditions for adapting it, recurrent operating costs and the institutions that could adopt it. It also identifies prospective adopters, their support needs and how the programme will organise and resource support for adaptation and implementation.
4.6 Local testbeds
The proposal identifies one or more clearly defined local testbeds, such as districts, corridors or metropolitan regions, where interventions will interact with real populations, assets and governance structures.
4.7 Embedded learning and pathway to a new normal
The proposal includes a developmental evaluation and learning plan with shared hypotheses for how change will happen, indicators covering system-level and equity outcomes as well as project outputs, and a strategy for turning isolated results into an embedded new normal, for example through replication, regulatory change, new standards or institutionalisation. The plan treats what does not work as a source of learning.
4.8 Underlying rules and structures
The proposal includes at least one intervention at the level of underlying rules and structures, such as law and regulation, finance and contracting, governance and organisational form, or relational and trust-based infrastructure.
4.9 Financing and investment pathway
The proposal maps the funding needed for orchestration and project preparation separately from the capital needed for implementation. It identifies likely public, concessional, philanthropic or private sources, an existing local investment structure or a plan to create one and how the portfolio will be reviewed nationally or through a country platform. The proposal shows how operating costs of the demonstrator will be covered after the grant ends. It also maps potential sources of technical assistance and finance for the portfolio and pipeline implementation. Assessors should expect stronger evidence at later funding stages.
4.10 Demand-led focus and credible purchasing pathway
The proposal shows how cities and other prospective buyers have shaped the demonstrator’s focus, including the requirements a solution would need to meet. It assesses potential purchasing volumes, timing, budget and legal constraints, describes how demand could be coordinated within or between cities, for example through First Mover Cities or a similar initiative, and identifies who will review findings and decide on next procurement steps. It distinguishes early expressions of interest from authorised purchasing commitments.
Chapter 5. System demonstrator readiness ladder
This ladder sets out four levels of readiness, from early exploration to a demonstrator that has scaled and embedded change. It can be used to judge where a city starts and what support would help it reach the next level. The levels relate broadly to the stages in Chapter 3: a city at level 1 is ready to define its system and mission, a city at level 2 is ready to build its demonstrator and a city at level 3 is implementing its portfolio. Level 4 describes what a demonstrator may achieve over a longer period, and few will reach it within a single programme, so moving up one level is itself meaningful progress.
5.1 Level 1: Exploring. Individual projects exist but no investment portfolio
System position
City or national actors recognise that isolated pilots are not delivering urban transformation and want a more integrated, systemic approach. There may be a general vision, such as a climate-neutral or resilient city, but no clearly bounded system mission yet.
Coalition and governance
One or two champion institutions, often a city department or ministry, are willing to convene, but coalitions remain ad hoc and siloed.
Portfolio and testbeds
Several climate or development projects are under way, managed as separate pilots with no overarching portfolio.
Underlying rules and structures
Regulatory, financial and institutional barriers are recognised in general terms but not yet analysed or targeted.
Learning and the new normal
Monitoring focuses on project outputs, with little attention to system-level change, replication or long-term sustainability.
Finance and investment
Projects are funded one by one, mostly through grants or departmental budgets, with no overview of investment needs.
Demand and market creation
Buyers and procurement teams have not helped shape the mission. The city has an initial picture of its purchasing needs, but decisions are fragmented and there is no commitment to test or coordinate demand.
Support to reach the next level
Light-touch orientation and scoping support, such as workshops on system demonstrators and portfolio thinking. Small grants for diagnostic work, for example a system scan, actor mapping or a review of existing plans and projects.
5.2 Level 2: Emerging. Investment needs mapped and potential financing barriers identified
System position
A specific mission and system boundary have been defined, aligned with national or international priorities and urban sustainability strategies, for example decarbonised, resilient and inclusive public transport in a named city by a set date.
Coalition and governance
A core coalition with a shared statement of intent is in place, bringing city government together with at least two of the following: a national ministry, utilities, a financial institution, a community organisation or a private company. An orchestration team to coordinate across departments and stakeholders has been identified or is being formed.
Portfolio and testbeds
Existing and planned projects in the mission area are mapped as an emerging portfolio, making gaps, overlaps and synergies visible. One or more potential local testbeds, such as districts, corridors or city regions, have been identified but not yet fully programmed.
Underlying rules and structures
System mapping has identified the key regulatory, financial and institutional barriers, and possible interventions on rules and structures are being explored.
Learning and the new normal
Stakeholders have set out preliminary hypotheses for how change happens in this context, with possible indicators that include co-benefits such as health, equity, nature and resilience.
Finance and investment
Investment needs across the emerging portfolio have been mapped and potential financing barriers and sources of public, private and concessional finance have been identified.
Demand and market creation
Influential public and private buyers in the system have been identified and engaged, and barriers in procurement rules, specifications and practices have been mapped.
Support to reach the next level
Design grants to co-develop a system demonstrator concept, covering detailed system mapping, stakeholder engagement, portfolio design, testbed selection and early indicator design.
5.3 Level 3: Demonstrating. Financing strategy developed, public and private roles identified, investment opportunities structured
System position
A time-bound system demonstrator plan has been approved, with a clear mission, baseline, targets and system boundary, consistent with national priorities.
Coalition and governance
Formal mandates and governance structures, such as a memorandum of understanding, mission charter or city contract, set clear roles for implementation, learning and decision-making. The orchestration team is resourced, and the design includes ways to build trust, inclusive participation and psychological safety, such as regular multi-stakeholder forums and community engagement.
Portfolio and testbeds
A portfolio of mutually reinforcing interventions covering at least three dimensions of change is being implemented. One or more local testbeds are active, with interventions deployed and adjusted in real conditions.
Underlying rules and structures
At least one intervention explicitly targets underlying rules and structures, for example regulatory reform, a new financing instrument, a new governance model or new contracting standards.
Learning and the new normal
A learning and evaluation framework is in operation, with regular reflection and published learning. Plans for embedding change are being developed, covering regulation, standards, replication within the city and integration into national frameworks.
Finance and investment
A financing plan combines grants, public budgets and, where relevant, private or blended finance, with a clear rationale for how co-financing is structured.
Demand and market creation
Procurement approaches linked to the portfolio are being tested, for example new award criteria, material or performance standards or coordinated demand among public and private buyers, and the city is exploring joint demand with other cities.
Support to reach the next level
Larger-scale implementation funding for the demonstrator’s portfolio, including policy, institutional and financial innovations. Technical assistance for financial structuring, regulatory sandboxes and replication strategies. Facilitated exchange and targeted adaptation support for prospective adopters.
5.4 Level 4: Transitioning the system. Portfolio connected to funders, financial institutions, procurement mechanisms and replication pathways
System position
The demonstrator has documented system-level outcomes, such as sustained emission reductions, resilience gains or social inclusion, and has shifted key drivers of the problem it set out to address.
Coalition and governance
The mission has outlived the original project phase. Governance arrangements, roles and routines are institutionalised in city or national systems.
Portfolio and testbeds
Successful interventions have been scaled up or replicated elsewhere in the city or in other cities in the country or region. The city or country maintains a dynamic portfolio, adding and retiring actions as it learns and as new risks or opportunities arise.
Underlying rules and structures
Key regulatory, financial and institutional changes have been codified and shared, for example new standards, contracts, financing instruments, planning tools or governance models that others can adopt.
Learning and the new normal
There is clear evidence of a new normal: new behaviours, norms and practices are visible and sustained, for example in how people travel, use energy or use land. The city or country acts as a learning hub for others, contributing to wider platforms and networks.
Finance and investment
Mainstream public and private finance has been realigned behind the new system, for example through capital investment plans, sector budgets or institutional investors. Mature demonstrators may also feed into national or international portfolios that aggregate common investment needs and connect them to development finance institutions, philanthropic capital, private investors and market-shaping mechanisms.
Demand and market creation
Aggregated demand, procurement models or market commitments allow locally demonstrated solutions to scale beyond their original context.
Support to progress further
Support for scale-up and replication, including connections to regional and global funds, peer learning between cities and policy diffusion. Performance-based or outcome-based financing linked to demonstrated systemic outcomes.
Chapter 6. Adoption support for this blueprint
A blueprint can set out what a system demonstrator programme needs to contain, but much of what made the Swedish programme and the Climate Smart Cities Challenge work was learned in practice: how to handle procurement and state aid rules, how to build an actor constellation, how to secure a political mandate and how to set grant rates and co-financing so that the right organisations take part.
It is therefore likely that any government, funder, country platform or other organisation using this blueprint would benefit from targeted support when adapting the system demonstrator approach to their own legal and institutional settings. This kind of support could help programme designers work through the considerations in Chapter 3, exchange experience with funders and city teams, identify questions requiring specialist advice and connect with appropriate implementation partners. It should be timed to key decisions, such as developing a concept note, designing a call or preparing for implementation. The blueprint remains openly available and can be applied independently; adopters with established capabilities and partnerships may already have the support they need.
This targeted support should probably sit within a broader, adequately resourced support arrangement of the kind described in Chapter 3. Implementing a system demonstrator may require sustained assistance with portfolio development, technical analysis, community engagement, legal and regulatory issues, project preparation, financial structuring and procurement. Depending on their mandates and presence in the country, organisations such as WRI, UNEP, ICLEI, UN-Habitat and C40 may contribute alongside country platforms, local institutions, specialist partners and development finance institutions. Roles, resources and responsibilities should be agreed with the adopting government, funders and participating cities, building on existing support arrangements.
The programme should make clear how initial adoption support connects to continuing implementation capacity, who provides and funds each function, and how support reaches actual policy, procurement and investment decisions. As the method is still developing, experience from new programmes should inform subsequent versions of the blueprint.
References
Bulkeley, H. and Castán Broto, V. (2013) Government by experiment? Global cities and the governing of climate change. Transactions of the Institute of British Geographers 38(3): 361–375.
CHAMP (2026) CHAMP Implementation Roadmap 2026–2028. Coalition for High Ambition Multilevel Partnerships for Climate Action.
Cities Climate Finance Leadership Alliance (CCFLA) (2025) Catalyzing Aggregated Purchasing Power: The Role of Private and Public Intra-City Procurement for Advancing City Climate Action. Developed with Viable Cities and the Green Transition Initiative.
EIT Climate-KIC (2020) Deep Demonstration of Healthy, Clean Cities. Deep Demonstration Factsheet Series 1. London: EIT Climate-KIC.
First Movers Coalition (n.d.) First Mover Cities: Charter for participating cities. Geneva: World Economic Forum.
Geels, F.W. (2002) Technological transitions as evolutionary reconfiguration processes: a multi-level perspective and a case-study. Research Policy 31(8–9): 1257–1274.
Global Environment Facility (2018) Policy on Co-Financing (FI/PL/01). Washington, DC: Global Environment Facility.
Global Environment Facility (2022) GEF-8 Programming Directions (GEF/R.08/29/Rev.01). Washington, DC: Global Environment Facility.
Global Environment Facility (2026) Policy on Environmental and Social Safeguards (SD/PL/03). Updated 1 July 2026. Washington, DC: Global Environment Facility.
Housing Festival (2024) Social Rent Housing at Pace Playbook. Bristol: Housing Festival.
Housing Today (2026) UKREiiF 2026: Housing minister announces national rollout of small sites aggregator. Housing Today, 19 May 2026.
Inside Housing (2025) West of England Combined Authority picked to lead £6m pilot for 1,000 homes on small sites. Inside Housing.
IPCC (2022) Climate Change 2022: Mitigation of Climate Change. Contribution of Working Group III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. Chapter 8: Urban systems and other settlements (Lwasa, S., Seto, K.C., Bai, X. et al.). Cambridge: Cambridge University Press.
Schot, J. and Steinmueller, W.E. (2018) Three frames for innovation policy: R&D, systems of innovation and transformative change. Research Policy 47(9): 1554–1567.
Seto, K.C., Davis, S.J., Mitchell, R.B., Stokes, E.C., Unruh, G. and Ürge-Vorsatz, D. (2016) Carbon lock-in: types, causes, and policy implications. Annual Review of Environment and Resources 41: 425–452.
UN-Habitat and Viable Cities (n.d.) Climate Smart Cities Challenge: A Retrospective. Nairobi and Stockholm: UN-Habitat and Viable Cities.
UN-Habitat and Viable Cities (n.d.) Climate Smart Cities Challenge: Four System Demonstrator Concepts. Nairobi and Stockholm: UN-Habitat and Viable Cities.
UNEP (2025) Emissions Gap Report 2025: Off Target. Nairobi: United Nations Environment Programme.
Viable Cities (2026) EnergyNet and the Future of Local Energy Systems. Viable Cities Outlook. Stockholm: Viable Cities.
Vinnova (2022) Erbjudande att utveckla systemdemonstratorer. Steg 1: Designfas [Offer to develop system demonstrators. Step 1: design phase]. Dnr 2022-00230. Stockholm: Vinnova.
Vinnova (2023) Systemdemonstratorer för klimatneutrala städer: Planeringsfas [System demonstrators for climate-neutral cities: planning phase]. Dnr 2023-00985. Stockholm: Vinnova.
Vinnova (2024) Systemdemonstratorer för klimatneutrala städer: Systemdemonstratorer i praktiken 2024–2026 [System demonstrators for climate-neutral cities: system demonstrators in practice 2024–2026]. Dnr 2024-00359. Stockholm: Vinnova.
Wolfram, M. (2016) Conceptualizing urban transformative capacity: a framework for research and policy. Cities 51: 121–130.